Location

Nashville, TN

Year

2017

Industry

Headquarters

Architect

Wilson Architects

General Contractor

Clark Construction

Certification(s)

LEED Gold

The Vanderbilt Engineering & Science Building required a high-precision façade system to support research laboratories, collaborative spaces, and energy-efficient building operations. PS provided the project’s exterior glazing scope, installing multi-story curtainwall, punched openings, and insulated glazing assemblies engineered for thermal control, air/water resistance, and structural performance. The façade design involved coordinating connection points with steel and concrete framing, managing differential movement, and aligning system tolerances with stringent laboratory performance requirements. PS’s installation delivered a stable, high-performing envelope that supports the building’s mechanical efficiency and specialized interior environments.

Contact Us

We’re here to provide guidance, information, and next steps for your project.

Contact Us