Architect
HOK
General Contractor
Swinerton Builders
Certification(s)
LEED Gold
The Chevron Midland Campus is a multi-building corporate complex totaling more than 330,000 sq. ft., including two four-story office buildings, a fitness center, cafeteria, training facility, and supporting infrastructure. PS was subcontracted to provide the exterior glazing systems, supplying and installing high-performance curtainwall, punched-opening windows, and insulated glazing units engineered for thermal efficiency, structural performance, and long-term durability in the West Texas climate. The project required careful coordination of anchorage, slab-edge transitions, and façade interfaces across multiple building types while maintaining consistent system performance and aesthetics throughout the campus.